Post-trip inspection: what to check at the end of the day, and when to write it up
The post-trip is the last walk-around of the day. It catches what broke on the road while the truck is still in the yard, so it can be fixed before the next pre-trip. The rule behind it is §396.11: at the end of each day's work, a driver writes a report on each vehicle when a defect was found or reported.
What to check
The written report must cover at least eleven parts (§396.11(a)(1)): service brakes including trailer brake connections; parking brake; steering mechanism; lighting devices and reflectors; tires; horn; windshield wipers; rear-vision mirrors; coupling devices; wheels and rims; emergency equipment.
Good practice adds what the day tends to break: air leaks and air lines, fluid leaks under the truck, mud flaps and body damage, load securement points, and anything the driver noticed while driving (a pull, a noise, a warning light). The free pre-trip inspection checklist works for the post-trip too.
When a written report is required
- A report is required when a defect or deficiency was found by or reported to the driver that would affect safe operation or cause a breakdown. With no defect, no report is required (§396.11(a)(2)(i)).
- One report per vehicle: a driver who used two trucks that day writes one for each.
- The driver signs it. In a two-driver team, one signature is enough when both agree on the defects (§396.11(a)(2)(ii)).
- The report rule doesn't apply to a carrier operating only one commercial motor vehicle, to driveaway-towaway operations, or to a private carrier of passengers (nonbusiness) (§396.11(a)(5)). The pre-trip duty in §392.7 still applies to every driver.
The DVIR requirements guide has the full detail, including trailers, dollies and the history of the no-defect rule.
What happens to a defect
- Before the vehicle runs again, the carrier repairs any defect likely to affect safety (§396.11(a)(3)(i)).
- The carrier certifies on the report that the defect was repaired or that repair is unnecessary (§396.11(a)(3)(ii)).
- The next driver, before driving, reviews the last report and signs that the repairs are certified (§396.13). The signature isn't needed for defects on a towed unit no longer in the combination.
How long to keep it
Three months from the date of the report: the report, the repair certification and the driver's review signature (§396.11(a)(4)). Reports may be electronic (§396.11(a)(6), §390.32), and paper is just as acceptable. The free DVIR form covers the paper version.
Do you need software for this?
Not for the rule. A pad of DVIR forms in each cab and a shop that signs the repair certification meets it in full. What paper can't do is keep a defect from being forgotten between the yard and the shop. Ledger Road keeps each reported defect open until it's repaired and signed off, and keeps the reports by truck. If your shop already closes every write-up before the truck goes out, you don't need it.
Sources
The sections this page cites, on eCFR. Read the paragraph, not the summary.
- 49 CFR 396.11 Driver vehicle inspection reports
- 49 CFR 396.13 Driver inspection before operating
- 49 CFR 392.7 Equipment, inspection and use (the pre-trip)
- 49 CFR 390.32 Electronic documents and signatures
Questions people ask
Is a post-trip inspection required?
The end-of-day report is: 49 CFR 396.11 requires a written report on each vehicle when a defect or deficiency was found or reported. With no defect, no report is required. Carriers with only one commercial vehicle are outside this rule.
What is the difference between a pre-trip and a post-trip inspection?
The pre-trip (49 CFR 392.7) is the check before driving, including reviewing the last report. The post-trip is the check at the end of the day that produces the written report of defects for repair.
Who signs off the repairs?
The motor carrier or its agent certifies on the report that each listed defect was repaired or that repair is unnecessary, before the vehicle is used again. The next driver then signs that they reviewed it.
How long do we keep post-trip reports?
Three months from the date of the report, together with the repair certification and the next driver's signature.
Can the post-trip report be electronic?
Yes. 49 CFR 396.11(a)(6) allows the report to be created and kept electronically under 49 CFR 390.32. Paper reports are just as acceptable.